Introduction
Location
Surroundings
Preferential Policies
Industry Development Discipline
Municipal Construction
Investment Procedures
Production
Facilities
Service


  Municipal Construction

Seven Expedite:

Water supply: water pipes are laid along the roads of the area.
Drain: pipes for rain, contamination and Water Supply are laid along the roads, with outlet for future connection preserved.
Natural Gas: pipes of Middle-pressure are preserved along the road.
Water Supply: pipes are laid along the road.
Tele-communication, Cable TV and Broad Band Network: there is a telephone exchange of 20,000 phones; cables for telephone, TV and broad band network are laid along the road; a interface hole is preserved for local urban facilities connection.
Electric Power: transformer substation, switch station and switch room in the area have been built
Transportation: there are main roads in the layout of the park.

One Flat:

                            landscape in the
                            park is flat.